Dan Cake signs contract with Helena Patacão for installation of photovoltaic system for self-consumption with a total of 850 KW

11/12/2018

Dan Cake signs with Helena Patacão, contracts for the installation of two UPAC plants with a total of 850 kWp.

This measure is an integral part of the energy rationalization and environmental responsibility plan assumed by Dan Cake, held by Helena Patacão, avoiding the emission of around 450 tonnes of CO2 per year.